Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
shoring for concrete operations should be | 1.37 | 0.6 | 1915 | 38 | 41 |
shoring | 0.77 | 0.3 | 7477 | 32 | 7 |
for | 1.08 | 0.9 | 3388 | 12 | 3 |
concrete | 1.56 | 0.9 | 7598 | 48 | 8 |
operations | 1.27 | 0.3 | 1770 | 81 | 10 |
should | 1.51 | 0.5 | 3381 | 4 | 6 |
be | 0.45 | 0.3 | 2876 | 7 | 2 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
shoring for concrete operations should be | 0.53 | 0.6 | 7664 | 25 |
what is concrete shoring | 0.81 | 0.5 | 9173 | 28 |
concrete slab shoring design | 0.43 | 0.3 | 9089 | 67 |
shoring for suspended concrete | 0.72 | 0.9 | 2239 | 64 |
shoring in building construction | 1.45 | 0.1 | 4530 | 11 |
shoring in construction pdf | 0.12 | 0.5 | 200 | 94 |
shoring work in construction | 1.51 | 0.8 | 1498 | 45 |
shoring vs reshoring concrete | 0.67 | 0.4 | 3026 | 82 |
shoring in construction for sale | 0.06 | 0.6 | 8892 | 65 |
type of shoring in construction | 0.33 | 0.3 | 8200 | 53 |
shoring and reshoring concrete slabs | 1.61 | 0.8 | 3342 | 43 |
shoring system in construction | 1.6 | 0.8 | 4415 | 64 |
concrete shoring companies near me | 0.63 | 0.7 | 1392 | 23 |
when is shoring needed for excavation | 0.97 | 0.3 | 5337 | 42 |
what is construction shoring | 1.63 | 0.4 | 3990 | 82 |
when is shoring required | 0.61 | 0.1 | 8212 | 22 |
shoring in construction meaning | 0.87 | 0.7 | 3364 | 77 |